Production Calculations

  • Production Rates
    • Required Capacity / Utilization Factor
    • 600 tph / 0.7 = 860 tph
  • Payload
    • Production Rate / Cycles per hour
    • 860 tph / ((3600sec/hr)/ 78 sec) = 18.63 ~ 19 tons per cycle
  • Skip Weight
    • Payload * (5/8)
    • 19 * 5 / 8 = 11.875 ~ 12 tons
  • Ratio
    • Skip Weight / Payload
    • 12 / 19 = 0.632