Production
Calculations
- Production Rates
- Required
Capacity / Utilization Factor
- 600 tph / 0.7 =
860 tph
- Payload
- Production Rate
/ Cycles per hour
- 860 tph /
((3600sec/hr)/ 78 sec) = 18.63 ~ 19 tons
per cycle
- Skip Weight
- Payload * (5/8)
- 19 * 5 / 8 =
11.875 ~ 12 tons
- Ratio
- Skip Weight /
Payload
- 12 / 19 = 0.632
|