Out Building Progress

The foundation has been dug and the lower walls built.

Blue board is placed below the final cement slab to insulate the floor.

The building goes up.

9/29/2003 The car port/porch goes up.

9/30/2003- Roof Installation (brown metal)

10/2/2003, Construction (Excellent job by White Spruce Enterprises) complete, Garage Door & Finishing still left to complete.

Due to the unusually warm weather this October we began staining the outbuilding on the 4th of October.

We used Superdeck-transparent stain. It was rolled on (David) and brushed on (Renate).

We finished the staining on the second day (5Oct). The second coat can be put on next summer!

Next, the ceiling had to be insulated. Cardboard thingies are placed at the ends to allow for air circulation above the insulation.

Clear (do not let them sell you black) sheeting is placed over the insulation to form a vapor barrier. The seams are sealed using 'acoustic sealant'. It is convenient to have graduate students (Ryan Woodard) so when they come over to borrow something they can be put to work as was the case on this day.

David uses a plumb to draw a straight line so the drywall is attached along the studs. A panel lift was used to lift the drywall up to the ceiling. The ceiling drywall must be done before the garage door can be installed (12-14 Oct, ceiling insulation).

Garage door is in place on October 17th. Still no snow, just frost.

29 Nov 2003 after about 24" of snow this month!